Process

No mystery vans. A clear day, start to finish.

Here is exactly what happens between your first message and the moment we hand back your keys.

01

Intake

You send piece lists or photos. We ask floor number, lift size, and preferred days.

02

Quote

Fixed band or itemized estimate within one business day for standard jobs.

03

Confirm

Deposit optional on large commercial jobs. You receive lead installer name and ETA window.

04

Arrive

Crew checks in, protects floors, stages boxes by room — not in a chaotic pile.

05

Assemble

Hardware sorted first. Frames leveled. Wall fixings chosen for the actual substrate.

06

Tune

Doors, drawers, soft-close, and anti-tip straps adjusted until they feel right.

07

Walkthrough

You test every moving part. We note any manufacturer defects for your supplier claim.

08

Clear out

Packaging bagged. Tools counted. Corridor swept. Invoice sent the same day.

Installation tools laid out

What “tidy install” actually means

We do not use your kitchen knives as scrapers. We bring our own blades, bits, levels, and vacuum for sawdust from drilled anchors. If a panel arrives damaged, we photograph it before assembly so your retailer dispute has evidence.

Read FAQs